GF-TA Fiber storage box
关键词:
Classification:
Keyword: GF-TA Fiber storage box
E-mail:
Tel:
Detail
1. Product Overview
1.1. Specifications

1.2. Product Configuration

1.3. Cable details

1.4. Plug details

Insertion damping (IL) | maximum ≤ 0.25 dB Average value ≤ 0.12 dB |
Reflux attenuation (RL) | ≥ 65dB |
Storage and transportation temperature | -40~+70℃ |
Minimum drilling diameter | Option 1: 12mm Option 2: 6mm |
1.5. Product variables

1.6. Install adapter board (optional)

2. fixture
The attachment does not include fixed devices. These are based on their nature Choose and install
professionally.
3. Instruction Manual
3.1. Pry open with a straight-head screwdriver

3.2. Pull up the buckle

3.3. Pull out the cable and select the appropriate output. Rotate the cable to the desired length


·Alternative 1 (pull-out coverfor drop cable)
3.4. Secure the cable onto the cable cover and place the optical cable. (Maximum voltage 100N)

3.5. After placing the cable, remove the pull-out cover and connect the LC . Unnecessary cable length
Retrieve the original dosage.

·Alternative 2 ( Air blown cable with connector)
3.6. Integrated design of air blown optical cable and LC connector, This design is suitable for site
applications where there is air blowing pipeline laying inside the house, Cooperate with air blowing
equipment to directly pass thro

3.7. After Air-blowing the pipeline and placing the cable , then Install the LC casing. Align the slot with the red
protrusion External shell.

3.8. Press down to lock the coil

3.9. Place the another side LC Connector inserted into the LC Couple(Adaptor) in the final position , Pay
attention to the direction.

4. wall-mounted
4.1. Install expansion screws

4.2. Secure the casing to the wall and install the casing cover.

5. Install on device socket through adapter board (optional)
5.1 Install the cable through the adapter board and socket

5.2 Install the adapter board onto the wall socket and secure it in placeThe casing is installed on the
adapter board, and then the casing cover is installed.

6. Install on DIN/hat rail via adapter board (optional)
6.1 Side plastic window breakthrough and locking nose on shellUnlock the installation base plate and
secure it with two screws.

6.2 Installed on DIN/hat track