Futureproof Solutions for Fibre Optic Network Deployment
Background
Originated in UK in 1982
Invented by BT, popularized in Europe, North America and Asian-Pacific region
Lower the initial investment and raise the working efficiency
Based on the advantages of blowing technologies, so many solutions roll up.
Microduct Bundles
Direct Buried (DB)
Direct Install (DI)
Direct Buried Reinforced (DBR)
Termite Resistant (DBT)
Petrochemical Resistant (DBP)
Low Fire Hazard (LFH)
Self Supporting (SS)
Primary Tube Sizes (mm)
3/2.1, 5/3.5, 8/6, 10/8, 12/10
Assembly Range
1,2,4,7,12,19 & 24
Minicable for Backbone Solution
Optical mini cable for installation into microducts by blowing using air at pressures up to 15 bar using industry standard equipment.
Low friction for improved installation performance
Ripcord provided for quick and easy sheath removal
Individually colour coded loose tubes for easy identification
Dry core with water swellable elements. Gel-filled loose tube.
Fibre Unit
Total Solution 1 Minicable Blowing for Backbone




Savings Come From
Saving at least 2 manholes per km
Speed of cable installation, time saving. Reduced by 70%. 6 to 8km of cable can be installed per day.
Trench size reduced so cost of trenching reduced Micro trenching can add to the cost saving
Direct Buried Open Trench

Horizontal Directional Drilling-HDD

Mole Ploughing

Micro Trenching

Manhole requirement for Minicable Solution

Minicable Storage Reel Installation

Road Side Cabinet

Minicable Blowing Machines

In site construction pics

Total Solution 2 Fibre Unit Blowing in the last mile &access network

Blown Fibre Installation Equipment

System Advantages Compare to Conventional Cable
Point to Point Fibre without splicing
Deferred Fibre Expenditure, Reduced Initial Investment
Increased Installation Distances, Less Fibre Splices
Push Fit Connector System, Rapid Fibre Deployment
Space Saving in Duct Networks
Lower Cost closures
Network Design Flexibility
Reduces fibre damage risk at time of installation, tube first fibre later
Can easily be upgraded, fibre counts & fibre types
Your futureproof optical fibre network solution
FTTH in Horizontal Development







Advantages
Point to point, no splicing
Lower duct cost&initial investment
Easy installation
Easy maintenance
Flexible network,upgrade anytime
Blown fiber& Tube bundle easy to transport, 6km fiber is 13kg only, saving freight
The longest disance for blowing is more than 1km, usually take 20mins to finish blowing installation
Few person, more efficiency
Fu Blowing in FTTH MDU Application
FTTH in High Rise MDU

Multi Dwelling Unit (MDU)

Commercial Building Deployment inSingapore
More than 2000 Commercial Buildings has been wired up with fibreflow






Industrial Park Deployment







Total Solution 3 Slot Cutting/Micro Trenching








Total Solution 4 Aerial Tube bundle Installation and blowing